Technogym Spec Library: Verification by the Numbers
A concise procurement workspace for reference values, document status, test conditions, trade-offs, and release gates.
Six fields every model review should resolve
Motor reference
A screening example for treadmill drive class, not a substitute for model rating or measured site load.
Running reference
Useful for comparing deck geometry; user fit and surrounding clearance require separate evaluation.
User-load reference
Applicable only where the final model data confirms this rating and required operating conditions.
Stack reference
A strength-stack screening value; increments, cable ratio, and exercise geometry affect practical loading.
Resistance selection
Selectorized resistance supports rapid changes; plate-loaded equipment supports a different training and service model.
Release control
Input review, model submittal, site verification, and commissioning produce a reproducible project trail.
Document set
Room Input WorksheetDimensions, utilities, access, operating profileCardio Model ComparisonDrive, deck, user capacity, clearance, powerStrength Planning MatrixResistance type, envelope, stack or plate logisticsInstallation Release ChecklistDrawing revision, route, floor, outlets, networkCommissioning & Handover RecordFunctional checks, staff orientation, service baselineSelection considerations
| Decision | Route A | Route B | Verify |
|---|---|---|---|
| Strength resistance | Selectorized: fast changes, broad user access | Plate-loaded: strength-focused use, plate handling | User skill, supervision, storage, exercise envelope |
| Treadmill drive | Curved self-powered: sprint emphasis, no drive motor | Motorized: programmed speed, incline, deck systems | Programming, acoustics, electricity, maintenance |
| Console connectivity | Connected: accounts, content, telemetry | Standalone: simpler network dependency | Privacy, bandwidth, update policy, support horizon |
Technical limits
Reference figures vary by exact model, region, software revision, electrical configuration, user behavior, and test method. Connected features depend on network availability and service terms. Energy use depends on load and program. Wear intervals depend on hours, environment, cleaning, adjustment, and preventive care.
Reproducible verification sequence
Record plan revision, operating hours, user profile, utilities, access, and applicable local requirements.
Attach the exact data sheet, installation manual, declaration or listing, and software or console version.
Confirm the rating and test context; distinguish reference values from project acceptance values.
Measure critical geometry and confirm utilities against the released drawing before placement.
Run manufacturer checks, record results and exceptions, obtain sign-off, and retain the lifecycle file.
Request the exact model file
Include market, quantity, room plan, operating profile, and target installation date.
Request Spec Pack